M1
Pretreatment and continuous pyrolysis
Assess feedstock sustainability, moisture, transport radius and the energy boundary of drying and continuous pyrolysis.
OltenCarbon · Solution 02 · Biochar & carbon credits
Agricultural and forestry residues are sorted, dried and continuously pyrolysed into stable biochar. Quality, energy-use and dMRV data are prepared under applicable national and international rules for soil, building materials, metallurgy and carbon removal.
Project context
Olten engineering modules
M1
Assess feedstock sustainability, moisture, transport radius and the energy boundary of drying and continuous pyrolysis.
M2
Stability, quality and application boundaries for soil, building materials, metallurgy and other directions.
M3
Project data around dMRV, applicable rules, quality data and third-party verification.
Review points
01
Raw-material traceability
Source, transport, pre-processing and batch records are the common starting point for project data and application decisions.
02
Product characterization first
Fixed carbon, ash, stability and pollutant indicators are confirmed for the target application and applicable rules.
03
Carbon value comes last
Methodology, verification, registration and buyer conditions decide whether carbon value can enter the project model.
CDR credit development & issuance
Confirm feedstock origin, alternative disposal, project boundary, product use and life-cycle emissions, then screen applicable biochar carbon-removal methodologies.
Stage outputProject boundary, baseline evidence, methodology checklist
Monitor and trace feedstock, input volume, pyrolysis temperature, energy, output, batches, quality, transport and final application.
Stage outputMonitoring plan, data points, batch traceability
Project design documents, LCA, lab testing and the evidence chain, reviewed by an independent validation and verification body.
Stage outputProject documents, test reports, VVB findings
After registry review, apply for issuance of the credit batch based on verified net removals.
Stage outputRegistry record, issued batch, unique credit IDs
After due diligence and agreement, transfer or retire credits in the registry and keep the use claim and evidence.
Stage outputTransaction documents, transfer record or retirement certificate
International standards
| Standard / body | Methodology / framework | Review notes |
|---|---|---|
| Puro.earth | Puro biochar methodology | Review and issuance rhythm confirmed by the platform and third parties |
| Verra · VCS | VM0044 biochar utilization methodology | Project boundary, methodology and verification decide suitability |
| Isometric | Biochar geological & soil storage protocol | Emphasis on digitized data and traceability |
| CSI · EBC / WBC | Carbon Standards International frameworks | Rules and review paths per the body's current documents |
| Rainbow Standard | Latest bio-carbon / carbon-removal rules | Qualification, methodology and issuance confirmed independently |
Delivery approach
Equipment configuration, engineering plans, material testing, product distribution and cooperation scope are subject to confirmed project information, site conditions and written agreements.
Contact Olten
The more accurate the parameters, the more useful the first process route, equipment selection, layout and investment model will be. Information is used only for preliminary discussion.
Tell us about the project